Nigeria’s grid-connected power plants operated at an average utilisation rate of 85 per cent in October 2026, as the country’s electricity generation system continued to face challenges relating to frequency and voltage stability.
The Nigerian Electricity Regulatory Commission (NERC), in its October 2026 Operational Performance of Power Plants Factsheet, disclosed that the average available generation capacity during the month stood at 4,744 megawatts (MW), while average hourly electricity generation was 4,047MW.
The figures indicated that power plants utilised 85 per cent of their available generation capacity during the review period, leaving approximately 697MW of available capacity unutilised.
Although the average load factor improved by 4.16 per cent compared with September 2026, average hourly generation declined by 1.02 per cent, while available generation capacity dropped by 5.85 per cent.
The performance shows the operational constraints confronting Nigeria’s electricity industry, particularly the need to improve generation capacity utilisation, grid stability and the reliability of electricity supply.
A breakdown of the performance of individual power plants showed that Jebba Power Plant recorded the highest load factor among the major energy producers, with 99 per cent, generating an average of 423MW against an available capacity of 429MW.
Omotosho 1 followed with a load factor of 97 per cent, generating 179MW out of its available capacity of 183MW, while Afam 2 recorded 94 per cent, with average generation of 371MW against 395MW available capacity.
Egbin 1 also delivered a strong performance, recording a load factor of 93 per cent, with average generation of 233MW against 250MW available capacity.
Ihovbor 2 equally achieved a 93 per cent load factor, generating 429MW out of 461MW available capacity, while Shiroro 1 recorded 89 per cent, with average generation of 401MW against 450MW available capacity.
Kainji 1 and Delta 1 each recorded a load factor of 84 per cent. Kainji generated 230MW against an available capacity of 274MW, while Delta generated 336MW out of 399MW.
Okpai 1 recorded a load factor of 78 per cent, generating 312MW against an available capacity of 402MW, while Odukpani 1 posted the lowest performance among the major energy producers, with a load factor of 66 per cent, generating 202MW against 305MW available capacity.
Despite the relatively strong utilisation levels recorded by some power plants, the factsheet highlighted significant challenges in maintaining the stability of the national electricity grid.
On frequency stability, NERC reported that the average lower grid frequency stood at 49.46 hertz (Hz), while the average upper grid frequency reached 50.66Hz during the month.
Both readings exceeded the prescribed operational frequency limits of 49.75Hz and 50.25Hz respectively.
The lower frequency reading was 0.29Hz below the minimum prescribed limit, while the upper frequency reached 0.41Hz above the maximum threshold.
Grid frequency is an important measure of the balance between electricity generation and demand. Significant deviations from the prescribed operating range can affect the stability of the electricity network and the performance of connected equipment.
The commission also identified deviations in grid voltage performance during the review period.
According to the factsheet, the monthly average lower grid voltage was 305.00 kilovolts (kV), below the prescribed minimum operating limit of 313.50kV.
Similarly, the average upper grid voltage reached 353.94kV, exceeding the prescribed maximum limit of 346.50kV.
The lower voltage reading was 8.50kV below the minimum threshold, while the upper reading exceeded the maximum prescribed limit by 7.44kV.
The deviations in both frequency and voltage point to persistent challenges in maintaining the national grid within its prescribed operational parameters.
Meanwhile, the performance of other grid-connected power plants showed varying levels of capacity utilisation during October.
Olorunsogo 1 recorded the highest load factor among the other grid-connected plants at 97 per cent, generating an average of 177MW against an available capacity of 182MW.
Sapele Steam 1 followed with 95 per cent, generating 22MW out of 23MW available capacity, while Geregu 1 recorded 87 per cent, with average generation of 96MW against 110MW available capacity.
Geregu 2 posted 84 per cent, generating 36MW out of 43MW available capacity, while Ikeja 1 recorded 82 per cent, with average generation of 79MW against 96MW available capacity.
Omotosho 2 and Omoku 1 each achieved 75 per cent load factors, generating 83MW and 22MW against available capacities of 110MW and 29MW respectively.
Olorunsogo 2 recorded 74 per cent, generating 70MW against 94MW available capacity, while Igbafor 1 achieved 68 per cent, with average generation of 4MW against six megawatts available capacity.
Zungeru 1 recorded a load factor of 65 per cent, generating 168MW out of 261MW available capacity, while Ihovbor 1 posted 63 per cent, with average generation of 52MW against 83MW available capacity.
Sapele 2 also recorded 63 per cent, generating 46MW against an available capacity of 74MW.
However, some plants recorded little or no generation during the period. Afam 1 generated an average of 2MW against five megawatts available capacity, representing a load factor of 32 per cent, while Rivers 1 recorded 20 per cent, generating 0.70MW against three megawatts available capacity.
Ibom Power 1 and Alaoji 1 recorded zero generation during the review period, despite their respective available capacities of 2MW and zero megawatts.
Trans Amadi 1 and Dadin-Kowa 1 both recorded 100 per cent load factors, generating three megawatts and 38MW respectively, matching their available capacities.
Kashimbila also recorded a strong performance, achieving a 99 per cent load factor, with average generation of 33MW against 33MW available capacity.
NERC explained that load factor measures the utilisation of a power plant’s available capacity, calculated as the ratio of average electricity generated over a period to the maximum possible generation.
The commission also noted that a load factor above 100 per cent could occur where generation companies are directed by the System Operator to maximise generation output above their declared steady-state availability to maintain grid stability.